Joined
·
3,769 Posts
And then there is stuff like this that does not help matters, in general:And you would have had a dozen or more say
Why did you do that, why not do this, I'm less than impressed, well you said ABC, now why are you changing def, etc, etc, etc
It's a no win situation
By the way, the bow testing is at a point where scorpyd has settled on the design and parts are being ordered.
If the parts make it by the promised date, if the parts are in spec then we are looking at 3 to 4 weeks